LK-Z2 Lightning rod ahead of time


LKZ2 series lightning rod ahead of time working principle


LK-Z2 series lightning rod ahead of time which use special design by adopting precursor discharge, impedance, current limiting and air-gap discharge technologies to generate precursor channel, improve receiving lightning effect ,reduce discharge voltage and change lightning discharge process. It avoids “flank attack” and “shielding failure to reduce ground potential counterattack damages and is perfect device to prevent direct lightning.

Feature:
1.The fastest discharge time is 86μs,preferentially lead lightning into ground and increase protection diameter.
2. More accurate ground lightning to reduce probability
3.Several times larger than common lightning rod protection diameter

4.Pure physics structure ,non electronic parts,non aging , free maintenance

5. Simple installation, light weight.
6. Good appearance by using SUS304 stainless steel materials.

二. LK-Z2 lightning rod ahead of time design description

1. It need correct coefficient by following construction area, height and locality lightning days etc to confirm lightning protection type

2. Then choose suitable LK-Z2 series lightning rod ahead of time.
3. Down lead should connect construction rebar electric or make two pcs down lead at least
4. Down lead should include disconnect card and is insulated with ground
5. Warranty time : 12 years.
三. Product application range
It is applicable to mobile communication base station, satellite earth station, radar station etc.

四、LK-Z2 lightning rod ahead of time  model and protection radius.


LK-Z2   lightning rod ahead of time model and protection radius.

Installation Height

H= the height which the lightning rod   is higher than LK-Z2 protected building

2

3

4

5

6

8

10

20

40

First Class SPD Building

32

48

65

79

79

79

79

80

77

Second Class SPD Building

40

59

78

97

97

98

99

102

105

Third Class SPD Building

44

65

86

107

107

108

109

113

118

 



    Contact us

  •  8th Floor (East), Building C, Weihuada Industrial Park, No. 5, Lirong Road, Xinshi Community, Dalang Street, Longhua District, Shenzhen
  •   0086-0755-83402479
  •   0086-0755-83402479
  • 200815188@qq.com

Category

Monitoring systemRail transitEnergy systemwireless communicatiIntelligent Building